Planning Your Project

5C.Planning-Your-Project These are the steps you will need to take to get wind power working for you!

Stages include:

Know Your Options

    Attend open days

    Gather information

Engage with Partner/Dealer

    Endurance Wind Power’s Partner/Dealer network are experienced in providing you with the best possible wind energy solutions and support from initial site evaluation to turbine installation and post installation wind turbine maintenance.

Site Qualification (timeframe: 1-2 months)

    Site suitability for construction - is there sufficient space to assemble and erect an Endurance wind turbine?

    Site suitability for steady wind flow - does the location offer the fewest obstructions that would interrupt wind flow and reduce the productivity of the Endurance wind turbine?

    Site proximity to electrical service - is there an electrical service grid connection point nearby, within 500ft is recommended?

Planning (timeframe: 3-9 months)

    In order to install a turbine at your site you must obtain the appropriate approval from your Local Planning Authority.

    The preparation, submission and monitoring of your planning application can be executed by your Endurance Wind Power Partner/Dealer.

Financing (timeframe: 4-6 months)

    With the Direct Ownership option financing should be secured as soon as possible.

    Engaging your lender of choice early in the project development process increases the chance of the project staying on track.

Installation and Commissioning (timeframe: 1-2 months)

  • Preparation and pouring of tower foundations
  • Installation of your Endurance wind turbine control panel
  • Trenching and electrical connection to the grid through your property electrical service
  • Assembly of tower
  • Installation of your Endurance wind turbine on your tower
  • Erection of the wind turbine and tower
  • Initial power up and operation of your Endurance wind turbine

Disclaimer: Timeline provided is only an estimate.